Information on production lead times and shipping date

Production Lead Time

Production Lead Time

Shipping date calculated in real time based on material, operations and shop load.

Real-time calculation

The shipping date is calculated live during configuration. For in-stock materials requiring only cutting, we typically ship in 2 to 4 business days.

Additional operations

Operations beyond cutting add approximately 1 day to production.

Outsourced processes

Anodizing, powder coating and plating typically add 7 to 10 business days, the time for our partners to integrate your parts into their schedule.

Automatic update

If the shop is full for a process, we update the shipping date automatically in real time.

Cut-off time

Our cut-off time is noon (ET), Monday to Friday. An order placed at 3 PM starts production the next day.

Large orders

Orders of at least 30 sq ft of raw material or 100+ pieces may require additional time. The shipping date adjusts accordingly.

Free shipping and fast carriers

Once produced, your order is shipped for free with the best carrier available at time of sending. Details on the Shipping page.

Lead time visual

Get your instant quote now

Custom parts, real-time pricing, quote in 30 seconds

Upload your 2D drawing or use our online sketch generator. No minimum order. Made in Quebec, Canada with free shipping across Canada.

Price in 30 seconds
No minimum order
Free shipping in Canada